Drawing group Figure 1 to 8, Connaught Centre Footbridge (1970–1978), Central, Hong Kong
Focuses on the renovation for the footbridge. Includes the location plan, site layout plans, elevations and sections for the existing footbridges and escalators, the proposed layout plans of cladding and after renovation. Original project title: proposed escalator for Connaught Centre Bridge Link. Drawings in the group: Fig.1 to Fig. 8.
This file is part of the Drawings, Connaught Centre Footbridge (1970–1978), Central, Hong Kong.
Details
Object Number
CA71/11/1/6
Archival Level
File
Related Constituents
Palmer & Turner (P&T Group) (Archive Creator)
Date
March 1984
Object Count
8 items
Collection
Credit Line
M+, Hong Kong. Gift of P&T Group (Formerly known as Palmer and Turner), 2020
Archival Context
Palmer and Turner (P&T Group) Project Archives, CA71 Drawings and photographic materials, Connaught Centre Footbridge (1970–1978), Central, Hong Kong, CA71/11 Drawings, Connaught Centre Footbridge (1970–1978), Central, Hong Kong, CA71/11/1 Drawing group Figure 1 to 8, Connaught Centre Footbridge (1970–1978), Central, Hong Kong, CA71/11/1/6