Basement floor plan, AIA Building (1965–1969), Stubbs Road, Wan Chai, Hong Kong
26 April 1965–25 April 1966
Added hand packed stone and subsoil drain around the external reinforced concrete wall, store, battery charge room, tools room, lounge, and canteen, machine room, finishing room and test rooms.