Drawing group D4, Jinling Hotel (1979–1983), Nanjing, China
Focuses on electrical and plumbing details. Includes detail drawings of sewerage treatment plant room, hose reel, waterproofing, cables, pipes, fire service inlet, sprinkler valve, tank, socket, supporting beams, and condensers. The 'R' in the drawing number indicates the major revisions in drawings. Drawings in the group: D4-01 to D4-07, D4-10 to D4-11, and R-D4-11.
详细资料
档案背景
巴馬丹拿項目檔案,CA71 中國南京金陵飯店(1979至1983年)繪圖及影像資料,CA71/13 Drawings, Jinling Hotel (1979–1983), Nanjing, China,CA71/13/1 Drawing group D4, Jinling Hotel (1979–1983), Nanjing, China,CA71/13/1/10